At facilities with no stationary insulation monitoring systems, portable PIMS kit can be temporarily connected to check the insulation level of DC network
In case of detection of insulation resistance reduction of the pole, the faulty bay can be manually detected by measuring the resistance of each bay one by one using PIM device (PIM device is included in the scope of supply)
Front view
PIMS has a sealed impact-resistant plastic case and includes the following components:
- relay for pole insulation resistance monitoring in DC network, IMR-02 type
- portable insulation fault detector in DC network
- wires for connection
PIMS connection scheme